Skip to content
Refpropos.

Refpropos.

  • Home
  • Automobile
  • HVAC
  • Supercar
  • Volvo
  • Entrepreneur
  • Toggle search form
EV charger rollout is failing disabled drivers

EV charger rollout is failing disabled drivers

Posted on May 20, 2025 By rehan.rafique No Comments on EV charger rollout is failing disabled drivers

Elsewhere, and in advance of the standard’s publication in 2022, charging company Osprey launched what it claimed was the UK’s first accessibly designed rapid-charging hub. It followed this with improvements to its existing compact and hub sites that included creating larger bays, removing kerbs and installing more accessible hardware.

The opening of another accessible charging site, especially given the size of Instavolt’s 44-acre Superhub in Winchester, is good news for EV owners and future buyers, but it bears out another concern expressed by the Public Accounts Committee: the geographic disparity of charging facilities. The report said London and the south-east alone host 43% of all UK charge points.

Meanwhile, it said, major roads in England’s southwest and in the north lack sufficient rapid-charger points, while it continues to be less commercially viable for charge point operators to serve rural areas.

“This raises concerns around regional divides and inequalities for different groups of drivers. Without action, it risks being baked into the rollout of charge points,” said the report.

The dominance of London and the south-east is also reflected in the distribution of the UK’s 15,000 rapid and ultra-rapid chargers. According to Zap-Map, by the end of February the region was home to around 3500, compared with major regions including the north-west and the West Midlands with around 1500 rapid and ultra-rapid chargers each. The north-east had barely more than 500.

Another concern raised by the report is that, as of January, approximately one-third of the UK’s 117 motorway service stations had yet to meet the DfT’s target of having six or more ultra-rapid chargers. “Charge points need to be installed in advance of need,” noted the report.

It suggested the shortfall might be explained by the fact that not one penny of the DfT’s Rapid Charging Fund (RCF), which was created five years ago to help finance grid connections on the strategic road network and is worth £950 million, has yet been spent.

ChargeUK, the organisation representing charging companies, welcomed the report but claimed that charger rollout was actually running ahead of demand. CEO Vicky Read said members wanted to increase the pace of installations but faced “delivery barriers”.

Automobile

Post navigation

Previous Post: The Benefits of Building a Relationship with your Commercial Roofing Contractor
Next Post: Last-Surviving V8 Compact Luxury Sedan Updated For 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • One Shoot, Three Screens: Making Content Fit TV, Desktop, and Mobile
  • How Tokenization Is Reshaping the Future of Investing
  • Mitsubishi anunció las actualizaciones para su línea de modelos del 2026
  • Stolen during WWII, an erotic Roman mosaic returns home
  • Nissan Fairlady Z | PH Private Area

Categories

  • Automobile
  • Entrepreneur
  • HVAC
  • Supercar
  • Volvo

Copyright © 2025 Refpropos..

Powered by PressBook Blog WordPress theme